Skip redundant pieces
School of Engineering
Research

Published by Thomas Glavinich


2006

Bai, Y. and T.E. Glavinich, “Emergence of the IBS Contractor,” ELECTRI International, Submitted and accepted. Publication in process.

Glavinich, T.E. and Y. Zhu, “Guide for Addressing Electrical Installation Seismic Requirements,” ELECTRl International, Florida International University. Submitted and accepted. Publication in process.

Glavinich, T.E., “Developing Strategies for Successfully Entering the Emerging Information Technology Market” ELECTRl International, Final research project report. Submitted and accepted. Publication in process.

Glavinich, T.E., “Bid Specification Reference Manual,” Submitted and accepted. Sheet Metal and Air Conditioning Contractors' Association (SMACNA), Publication in process.


2004

Construction Planning And Scheduling, The Associated General Contractors of America, Washington, D.C., Second Edition, 2004. Energy security and the Electrical Contractor, The Electrical Contracting Foundation, Bethesda, Maryland, 2004.

NECA Electrical Design Library, "Owner-Furnished Material & Equipment," National Electrical Contracting Association, Bethesda, Maryland, 2004.

NECA Electrical Design Library, "Service Options," National Electrical Contracting Association, Bethesda, Maryland, 2004.

Electrical Contractor, 2004 monthly State Of The Art Column based on results of ongoing research projects for the Electrical Contracting Foundation, Inc.


2003

Recommended Practice For Installing And Maintaining Temporary Electric Power At Construction Sites (ANSI/NECA 200), National Electrical Installation Standards (NEIS), National Electrical Contractors Association, Washington D.C., 2003.

School Construction Guide, The Associated General Contractors of America, Washington, D.C., 2003.


2002

Electrical Contractor, 2002 monthly article series based on results of ongoing research projects for the Electrical Contracting Foundation, Inc.