Published by Thomas Glavinich
2006
Bai, Y. and T.E. Glavinich, “Emergence of the IBS Contractor,” ELECTRI
International, Submitted and accepted. Publication in process.
Glavinich, T.E. and Y. Zhu, “Guide for Addressing Electrical
Installation Seismic Requirements,” ELECTRl International, Florida
International University. Submitted and accepted. Publication in
process.
Glavinich, T.E., “Developing Strategies for Successfully Entering the
Emerging Information Technology Market” ELECTRl International, Final
research project report. Submitted and accepted. Publication in process.
Glavinich, T.E., “Bid Specification Reference Manual,” Submitted and
accepted. Sheet Metal and Air Conditioning Contractors' Association
(SMACNA), Publication in process.
2004
Construction Planning And
Scheduling, The Associated General Contractors of America,
Washington, D.C., Second Edition, 2004. Energy security and the
Electrical Contractor, The Electrical Contracting Foundation,
Bethesda, Maryland, 2004.
NECA Electrical Design Library,
"Owner-Furnished Material & Equipment," National Electrical
Contracting Association, Bethesda, Maryland, 2004.
NECA Electrical Design Library,
"Service Options," National Electrical Contracting Association,
Bethesda, Maryland, 2004.
Electrical Contractor, 2004 monthly
State Of The Art Column based on results of ongoing research
projects for the Electrical Contracting Foundation, Inc.
2003
Recommended Practice For Installing And
Maintaining Temporary Electric Power At Construction Sites
(ANSI/NECA 200), National Electrical Installation Standards (NEIS),
National Electrical Contractors Association, Washington D.C.,
2003.
School Construction Guide, The
Associated General Contractors of America, Washington, D.C.,
2003.
2002
Electrical Contractor, 2002
monthly article series based on results of ongoing research
projects for the Electrical Contracting Foundation, Inc.